E-Rate RFPs

Introduction

The San Ramon Valley Unified School District (“District”) is requesting multiple proposals for installation of network wiring, wiring materials, LAN infrastructure equipment, and service for a wide area network connecting all 38 SRVUSD sites.

Materials for Network Wiring: 

RFP #796: SRVUSD is soliciting qualified vendors to submit proposals for network materials including: CAT 6A cableing, terminiation racks, patch panels, CAT6a jacks and plugs, pre-terminated fiber. 

Click here for complete RFP documents 

Responses must be received no later than March 7, 2019 at 3:00 pm (Pacific Time). 

Submitted questions and responses can be found here.  This will be continuously updated until March 1, 2019.

 

LAN Infrastructure Equipment:

The District is soliciting qualified vendors to submit a proposal for access points, switches, and uninterruptible power supplies. The LAN must allow for reliable and secure transmissions of voice, data and video via Cisco network equipment. The school LAN must connect this site to the District Service Center at a minimum concurrent 1000MPS connection, including a minimum Switched Layer 2 Ethernet service acting as an Ethernet bridge for connection between the district office and the school site utilizing TCP/IP protocols and full duplex operation (bidirectional connections). 

 

RFP #795:  Local Area Network (LAN) infrastructure equipment at the following schools: San Ramon Valley High School, Dougherty Valley High School, California High School, Monte Vista High School, Iron Horse Middle School, Diablo Vista Middle School, Los Cerros Middle School, Windemere Ranch Middle School, Pine Valley Middle School, Gale Ranch Middle School, Venture Alternative School, Golden View School.

 

Click here for complete RFP documents 

Responses must be received no later than March 7, 2019 at 3:00 pm (Pacific Time). 

Submitted questions and responses can be found here.  This will be continuously updated until March 1, 2019.

Questions:

  1. The current RFP posted specifically states, “Routing and switching equipment will be installed by the District – do not include installation labor in any pricing.” However, this does not call out installation/configuration of Access Points. Would the district like to see pricing for the implementation of the Access points? We do not need any configuration or implementation of the access points - we will do that in house.
  2. Is any other implementation, configuration, testing, or installation required that is not already stated in the RFP?  We just need the services stated in the RFP - inventory and verification that components are certified as fully operational.
  3.  Would it be possible for you to send a revised BOM, or a breakout, that indicates the equipment to be quoted by chassis as opposed to line items for the Local Area Network Equipment RFP #795? You may find the original BOMs we used to build the final list of materials here.  This should show how the items are linked to the products.  However be advised the spreadsheet provided as part of the RFP is the official list and any bids should use that document.  The list linked in this answer may not be 100% accurate in terms of quantity and parts requested.  It is merely provided as a guide.
  4. You'll have to sort our which component goes into which switch since the part numbers given does not fit into the configuration of the required switches in the list of equipment. Or let us know if would like us to quote on the part numbers mentioned in the attachment “Attachment A: RFP 795LAN Equipment?” Please see the answer above in Question #3.